Well…. A bit of movement at last on the little 250. Got the call on Friday that the engine rebuild was completed and ready for collection. So as luck would have it, yesterday (Saturday 21st) was exactly 6 weeks since my op so I was “allowed” to drive again. So jumped in the van and went down to Newark (anagram of😜) and collected it. The quality, certainly from the outside looks very good, hopefully the inside is as good🤞
So, my plan is, while I’m still waiting for the frame to come back from metal malarkey. I’m going to swap the engine in the standard RS (that I bought off kevberlin) so I can run it in over the summer months, I’ll use the engine out of the standard bike to do a “dry build” of the tracker when it’s ready. Then slot the rebuilt engine in once it’s all ready to go👍
Cheers, Michael