For me it's been a question of sharing my time between 3 projects which all require more time than i can give them
1, wind generator...got nearly as far as i can with this, until i can convince the plonkers at windsave that it's ok to put their generator on my pylon rather than the house wall
pylon is built, wiring in place......
2, installation of solar water panels.....well, got a couple of secondhand ones available soon, plumbing is about half done, but ties in with ....
3, 2000ltr heatstore, tank is made and sits in garage on pedestal, all plumbing in loft done, 'just' need to plumb in radiators, backboiler need fitting into woodburner and plumbing
into tank , it was supposed to be all up and running by christmas.......probably next christmas
4, srx No1, poor old girl sits in garage in bits, waiting for me to get a new piston and get the barrel rebored, taking it up to 640cc, january with any luck (pity i missed that one that went on ebay in november)
5, track bike, wots blown the head gasket (for the umpteenth time) grasping at straws now, all the threads have been helicoiled and are still ok, so am going to get the head and barrel 'faced' the same time as i get #1 rebored, but all this is not exactly weekend debrief, more a way of me realising what a humungous pile of cr*p there is outstanding, and that's before her indoors presents me with the proper job list !!
pip pip